top of page
Assembly of Freestanding Shelving in Sinteplast
This project was executed between 2018 and 2019, at the Sinteplast Plants
of the Town of C.Espegazzini.
The Project consisted of the assembly and assembly of one of the shelves
tallest in South America from the AR Racking firm, almost 40m high,
1,215 tonnes of steel and with a capacity for 18,536 pallets.

IMG-20180407-WA0010

20180803_154554

20180516_173718

IMG-20180407-WA0010
1/5
bottom of page