Assembly of Stacker Cranes and Roemmers Transport System

These projects were carried out between 2011 and 2015, at the Roemmers Plants in the towns of Mataderos and Luis Guillon.

The Projects consisted of the assembly and assembly of 2 Stacker Cranes, 1 Pallet Elevator of 3 Levels, 2 Conveyor Trolleys and the Set of Transportation Tables at the Slaughterhouse Plant and 3 Stacker Cranes, 1 Double Conveyor Trolley and the Set of Transportation Tables at the Luis Guillon Plant.